Laboratory Personnel
(MIT Digital Computer Laboratory, 1954-07-12)
Memorandum listing Laboratory Personnel of the MIT Digital Computer Laboratory.
Section Leader Meeting Group 62, June 14, 1954
(Lincoln Laboratory - Division 6, 1954-06-17)
Plans to establish engineering control of inspection and test of prototype system have been initiated. MRI design by IBM is delayed pending a Lincoln decision regarding method of relaying information from P site to Direction ...
Group leaders' meeting, June 21, 1954
(Lincoln Laboratory - Division 6, 1954-06-22)
Minutes of weekly group leader meeting discussing move to Lexington, meetings at IBM during week of June 21, typotron procurement, working hours at Lexington, and salary review.
Group 62 Section Leaders Meeting, October 25, 1954
(Lincoln Laboratory - Division 6, 1954-10-27)
Reorganization is placing magnetic work in Group 63. Questions regarding XD-1 operation are leading to consideration of change of delivery date. MRI specifications to be completed in approximately 2 weeks. Procedure for ...
Thoughts on Incremental Permeability
(Lincoln Laboratory - Division 6, 1954-09-17)
After a short discussion of the factors which influence the incremental permeability, three different methods are discussed which should give a large change in incremental permeability with a change of the biasing field. ...
Secret supplement to Biweekly Report of March 26, 1954
(Lincoln Laboratory - Division 6, 1954-03-26)
Memorandum detailing analysis of the 25 interception runs mentioned in the last secret biweekly report (M-2723) and 37 further runs made after correction of errors.
Group Organization List
(Lincoln Laboratory - Division 6, 1954-10-01)
Memorandum listing group organization of Lincoln Laboratory Division 6.
Organization and tasks of Division 6
(Lincoln Laboratory - Division 6, 1954-11-16)
Summary of the organization and duties of Division 6 staff members, including general organization, Group 61, Group 62, Group 63 magnetic materials and advance development, Group 64 production FSQ-7 and WWI, Group 65 vacuum ...
Summary of MIT-IBM Engineering Collaboration For The Period September 1 through October 31, 1954
(Lincoln Laboratory - Division 6, 1954-11-04)
Engineering activity level has increased with acceleration of planning and design for the production systems. Specifications for the prototype system (Exhibit AFCRC-l) has been brought up to date. Miscellaneous Radar Inputs ...
Secret supplement to Biweekly Report of January 29, 1954
(Lincoln Laboratory - Division 6, 1954-01-29)
Memorandum detailing a complete simulation of the F-99 interceptor performance and the evaluation of the improvement of tracking accuracy resulting from the use of radial velocity information available at the MTI radar sites.