Browsing Project Whirlwind Reports by Title
Now showing items 1021-1040 of 1719
-
Group leaders' meeting, October 11, 1954
(Lincoln Laboratory - Division 6, 1954-10-13)Minutes of weekly group leader meeting discussing Division 6 space, Air Force exhibit for the production system, direction center and combat center building plans, Group 63 memory cores, IBM memory core production, IBM ... -
Group leaders' meeting, October 18, 1954
(Lincoln Laboratory - Division 6, 1954-10-19)Minutes of weekly group leader meeting discussing installation of production AN/FSQ-7's, AN/FSQ-7 display, IBM relations and Building F, antiaircraft, direction center building plans, subcontract by IBM for AN/FSQ-7 design, ... -
Group leaders' meeting, October 1953
(Lincoln Laboratory - Division 6, 1953-10-??)Minutes of weekly group leader meeting discussing AN/FSQ-7 (XD-1) installation and IBM responsibilities, personnel, standards, briefing and demonstration of Cape Cod System for FSQ-7 design engineers, ADC visit during the ... -
Group leaders' meeting, October 20, 1952
(MIT Digital Computer Laboratory, 1952-10-23)Minutes of weekly group leader meeting discussing vacuum tube reliability, magnetic cores, comment on November 14 meeting, status of IBM contract, report on 701 computer, time schedule for WWII, and Joint Division 2 and 6 meetings -
Group leaders' meeting, October 25, 1954
(Lincoln Laboratory - Division 6, 1954-10-26)Minutes of weekly group leader meeting discussing future meetings, layout of production direction centers, delivery and engineering scheduled at IBM, Division 6 advanced development, and Division 6 space. -
Group leaders' meeting, October 26, 1953
(Lincoln Laboratory - Division 6, 1953-10-28)Minutes of weekly group leader meeting discussing ADC visit during the week of October 12, South Truro radar, plans for demonstration of the Cape Cod System on October 29, information for IBM administration, ADA visit on ... -
Group leaders' meeting, October 6, 1952
(MIT Digital Computer Laboratory, 1952-10-07)Minutes of weekly group leader meeting discussing security, budget, test equipment maintenance and space, Lexington Laboratory and research assistants, Michigan trip, magnetic memory, and EE department seminars. -
Group leaders' meeting, September 14, 1953
(Lincoln Laboratory - Division 6, 1953-09-15)Minutes of weekly group leader meeting discussing research assistants, staff candidate, applications program, general engineering group, installation in Building A, Whittemore Building conference room, WWI memory, quarterly ... -
Group leaders' meeting, September 20, 1954
(Lincoln Laboratory - Division 6, 1954-09-22)Minutes of weekly group leader meeting discussing display for AN/FSQ-7, installation of AN/FSQ-7 (XD-1), plans for the direction center buildings, gap fillers for SAGE, plans for IBM research, transfer of information between ... -
Group leaders' meeting, September 27, 1954
(Lincoln Laboratory - Division 6, 1954-09-29)Minutes of weekly group leader meeting discussing status of AN/FSQ-7 program, status of combat center design, liaison, maskers for fine-grain data, advanced development program, and space survey -
Group leaders' meeting, September 28, 1953
(Lincoln Laboratory - Division 6, 1953-10-01)Minutes of weekly group leader meeting discussing correction to minutes of September 14 group leaders' meeting, Western Computer Conference, Lincoln Laboratory seminars, briefing on Cape Cod System, move to Lexington, ... -
Group leaders' meeting, September 29, 1952
(MIT Digital Computer Laboratory, 1952-09-30)Minutes of weekly group leader meeting discussing flexowriter equipment, IBM, plug-in units, ERA drums, relations with Lincoln, and budget -
Group leaders' meeting, September 8, 1952
(MIT Digital Computer Laboratory, 1952-09-08)Minutes of weekly group leader meeting discussing third shift, meeting of the Scientific Advisory Board, IBM, space, magnetic cores, and visitors. -
Group organization list
(Lincoln Laboratory - Division 6, 1956-02-01)Full listing of all Division 6 personnel by groups and subsections. -
Group Organization List
(Lincoln Laboratory - Division 6, 1954-10-01)Memorandum listing group organization of Lincoln Laboratory Division 6. -
Group organization list
(Lincoln Laboratory - Division 6, 1955-03-10)List of Division 6 staff by group. -
High Speed Core Driver
(Lincoln Laboratory - Division 6, 1954-10-21)A high-speed core driver has been developed. The circuit consists of two pulse amplifiers, a slave flip-flop, a buffer amplifier (which has very rapid rise and fall times), and a current amplifier (Fig. 1). The rise and ... -
High-Speed Gas Discharge Gaps for Data Storage in Electronic Computers
(MIT Servomechanisms Laboratory, 1947-05-13)Master's Thesis Research proposal on High-Speed Gas Discharge Gaps for Data Storage in Electronic Computers. -
High-Speed Magnetic Pulse Control Circuits for Computers
(MIT Department of Electrical Engineering, 1952-08-06)Master's Thesis Research proposal on High-Speed Magnetic Pulse Control Circuits for Computers. -
Hysteresis Loop Characteristics of MF-1118 for Different Temperatures
(MIT Digital Computer Laboratory, 1952-10-16)The hysteresis loops were obtained in a temperature range from -196 degrees Centigrade to +305 degrees Centigrade. The Curie point of MF-1118 was reached at approximately 305 degrees Centigrade, and the maximum Squareness ...