Group leaders' meeting - September 26, 1955
(Lincoln Laboratory - Division 6, 1955-09-29)
Minutes of weekly group leader meeting discussing visit to IBM research laboratory, Building 10 program, preliminary meeting of Lincoln Committee A, M notes, space - Murphy Hospital, IBM space, Group 61 programmers, display ...
Specifications for the central computer system for the AN/FSQ-7
(Lincoln Laboratory - Division 6, 1955-01-28)
Memorandum listing the IBM specification documents and
Lincoln Laboratory M-notes which describe sections 0-9 of the AN/FSQ-7 Central Computer System. This series of documents was prepared to give the status of specifications ...
Specifications for the central computer system for the AN/FSQ-7, supplement 4
(Lincoln Laboratory - Division 6, 1955-10-24)
The AN/FSQ-7 specifications for the Central Computer System as recommended by Lincoln Laboratory were listed in 6M-3291 (released
by T.I.R. #1-57), 6M-3291 Supplement 1 (released
by T.I.R. #1-66), 6M-3291 Supplement 2 ...
Proposed XD-1 evaluation, 13 July 1955
(Lincoln Laboratory - Division 6, 1955-06-28)
The addressable fields of the magnetic drums (CD side),
the central computer, and the drum entry portion of manual inputs were included in the fourth XD-1 evaluation. This evaluation included shock tests, an eight-hour ...
SAGE System meeting 29 August 1955
(Lincoln Laboratory - Division 6, 1955-08-29)
Minutes of weekly SAGE System meeting discussing liaison with cooperating agencies in experimental subsector, lighting in ready room, air conditioning in Building F, display meeting, tape conversion equipment, and meetings ...
SAGE System meeting 18 April 1955
(Lincoln Laboratory - Division 6, 1955-04-18)
Minutes of weekly SAGE System meeting discussing Taylor's trip to Willow Run Research Center, ADES monthly status meeting, communications between the First Direction Center and P-sites, lighting in Building "F," operational ...
SAGE System meeting 24 October 1955
(Lincoln Laboratory - Division 6, 1955-10-24)
Minutes of weekly SAGE System meeting discussing new meeting time, IBM reorganization, visitors to Building F, tape conversion equipment, release of operational specifications, recruiting for Rand, test equipment for SAGE, ...
Group leaders' meeting, January 17, 1955
(Lincoln Laboratory - Division 6, 1955-01-20)
Minutes of weekly group leader meeting discussing integration of air traffic control Into SAGE system, IBM engineering support program, attendance at ADES monthly meetings, ADC delay on phone-line terminal equipment, ...
SAGE system meeting, February 28, 1955
(Lincoln Laboratory - Division 6, 1955-02-28)
Minutes of weekly SAGE System meeting discussing SAGE experimental subsector approval committee meeting, Mark X, computer time cycle, auxiliary memory drum meeting, engineering-installation-phasing committee meeting, and ...
SAGE system meeting, January 31, 1955
(Lincoln Laboratory - Division 6, 1955-01-31)
Minutes of weekly SAGE System meeting discussing recruiting, study of long-range objectives, status of Exhibit 17, status of DDR-DDT's, non-credit courses, and auxiliary memory.