Search
Now showing items 1-10 of 31
Master reference list of equipment specifications for XD-1
(Lincoln Laboratory - Division 6, 1958-03-28)
Compilation of all the active technical specification documents which received Lincoln-IBM concurrence for AN/FSQ-7 (XD-1) design. The list is a revision of the previous list, 6M-3851-5, and was brought up to date as of ...
Master reference list of equipment specifications for XD-1
(Lincoln Laboratory - Division 6, 1958-07-08)
Compilation of all the active technical specification documents which received Lincoln-IBM concurrence for AN/FSQ-7 (XD-1) design. The list is a revision of the previous list, 6M-3851-6, and was brought up to date as of 8 ...
Master reference list of equipment specifications for XD-1
(Lincoln Laboratory - Division 6, 1958-10-09)
Compilation of all the active technical specification documents which received Lincoln-IBM concurrence for AN/FSQ-7 (XD-1) design. The list is a revision of the previous list, 6M-3851-7, and was brought up to date as of 9 ...
Group leaders' meeting - 4 August 1958
(Lincoln Laboratory - Division 6, 1958-08-05)
Minutes of weekly group leader meeting discussing special projects, space, air traffic control, SAGE II computers, ESS gap fillers, and technicians, Group 62.
Group leaders' meeting - 19 May 1958
(Lincoln Laboratory - Division 6, 1958-06-04)
Minutes of weekly group leader meeting discussing union negotiations, radar presentation, SENEWS, ID problem, system tests specs, and recruiting.
Group leaders' meeting - 16 June 1958
(Lincoln Laboratory - Division 6, 1958-06-17)
Minutes of weekly group leader meeting discussing ALRI briefings, retrofit testing, Peter Bowman, job planning, and BOMARC.
Group leaders' meeting - 21 July 1958
(Lincoln Laboratory - Division 6, 1958-07-30)
Minutes of weekly group leader meeting discussing ADC meeting, SDC trip, SUBIC, account numbers, staff recruiting, and BOMARC et al.
Group leaders' meeting - 14 July 1958
(Lincoln Laboratory - Division 6, 1958-07-22)
Minutes of weekly group leader meeting discussing power outage, personnel, Boeing, SDC, BMEWS, CC, ESS, TX-0 drawings, and ALRI report.
Group leaders' meeting - 10 March 1958
(Lincoln Laboratory - Division 6, 1958-03-17)
Minutes of weekly group leader meeting discussing communication with Air Force contractors, Q-7 improvements, XD-1 computer time, IBM meeting, non-staff ceiling, accessions list, new personnel, and Building F security check list.
Group leaders' meeting - 18 August 1958
(Lincoln Laboratory - Division 6, 1958-08-20)
Minutes of weekly group leader meeting discussing air traffic control, meeting report, MITRE, Jim Degan, FY. '59 funds, and ALRI communications.