Procedure for Preparing and Stripping Wires for MTC Memory Planes
(MIT Digital Computer Laboratory, 1953-04-06)The stripping of formex insulated wires used in memory plane construction has been greatly speeded up by a method which permits them to be stripped in bundles of 150 wires rather than singly. -
Procedure for Receiving Magnetic Cores
(MIT Digital Computer Laboratory, 1952-05-16)Two procedures are outlined. The first is for the receipt of one or a small number of cores submitted for evaluation. The second is for the case of a lot of cores where the particular body has previously been evaluated. -
Procedure for stripping wires for 64 x 64 memory plane modules
(Lincoln Laboratory - Division 6, 1955-06-07)The required procedure for preparing and inspecting wires used in the construction of 64 x 64 memory plane modules has been recorded for the benefit of shop personnel and outside vendors. -
Programming for Whirlwind I
(MIT Servomechanisms Laboratory - ECD, 1951-06-11)The Whirlwind I computer, WWI, at MIT is a high-speed electronic digital computer. It will be used in a wide variety of applications involving computations for mathematical and engineering problems, accounting, statistical ... -
Progress Report for AN/FSQ-7 - 12 March, 1954
(Lincoln Laboratory - Division 6, 1954-03-12)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Progress Report for AN/FSQ-7 - 9 April, 1954
(Lincoln Laboratory - Division 6, 1954-04-09)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Progress Report for AN/FSQ-7 - May 20, 1954
(Lincoln Laboratory - Division 6, 1954-05-20)A recent meeting at ADC Headquarters covered several phases of Transition System planning. The situation display selection frame has been eliminated. Miscellaneous Radar Inputs (Fine Grain Data, Automatic Height Finding ... -
Progress Report for AN/FSQ-7, 19 February, 1954
(Lincoln Laboratory - Division 6, 1954-02-19)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 1950-03-02)Progress Report to the Department Committee on Graduate Study and Research on a Coincident-Current Magnetic Memory Unit. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 1950-04-24)Progress Report to the Department Committee on Graduate Study and Research on a Coincident-Current Magnetic Memory Unit. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 1950-05-18)Progress Report to the Department Committee on Graduate Study and Research on a Coincident-Current Magnetic Memory Unit. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 1947-04-18)Progress Report to the Department Committee on Graduate Study and Research on High-Speed Gas Discharge Gaps for Data Storage in Electronic Computers. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 2009-05-04)Progress Report to the Department Committee on Graduate Study and Research on a Coincident-Current Magnetic Memory Unit. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 1948-03-18)Progress Report to the Department Committee on Graduate Study and Research on a Trouble-Location Scheme for a Digital Electronic Computer. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 2009-05-08)Progress Report to the Department Committee on Graduate Study and Research on an Investigation of Ferroelectrics for Digital Information Storage -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 1950-07-05)Progress Report to the Department Committee on Graduate Study and Research on a Coincident-Current Magnetic Memory Unit. -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 2009-05-08)Progress Report to the Department Committee on Graduate Study and Research on an Investigation of Ferroelectrics for Digital Information Storage -
Progress Report to the Department Committee on Graduate Study and Research
(MIT Department of Electrical Engineering, 1947-10-25)Progress Report to the Department Committee on Graduate Study and Research on Gas Discharge Gaps for Data Storage in Electronic Computers. -
Progress Report, Project 6751, March 1 to October 1, 1951
(MIT Digital Computer Laboratory, 1951-10-02)During this period we have been working on problems proposed by the Carter Oil Company and by the Humble Oil Company. We have had personal visits and inquiries from members of these companies and of the Magnolia Petroleum ... -
Progress Report, Project 6751, November 13, 1950 To March 2, 1951
(MIT Servomechanisms Laboratory, 1951-03-14)During the period from November 13, 1950, to January 29, 1951, work on Project 6751 — the application of a digital computer to underground oil reservoir problems — was directed towards gaining familiarity with the problems ...